YEARS’ EXPERIENCE IN OPTIMAL SOLUTIONS

2000 — 2001 – The Complex began its activities. The Joint Activities Agreement with the Odessa Commercial Sea Port was signed for 49 years term.
2001 – First construction stage was set in operation.
2001 — The first vessel lot of palm oils was discharged.
2004 – Complex modernization. The second construction stage.
2004 – Simultaneous handling of two vessels: palm products and animal fats.
2008 — The 100th vessel was handled, 1 000 000 tons of cargo transshipped.
2008 — Palm products were loaded onto the vessel.  Loading was performed using 2 lines.
2009 — The second construction stage was set in operation. The first vessel with sunflower seed oil was handled.
2009 — ISO certification.
2010 – Simultaneous handling of two vessels: palm products discharging and sunflower seed oil loading.
till 2015 — Advanced development plan provides Complex expansion.  Total capacity will make 96 000 tons of simultaneous storage.